{"id":1484,"date":"2024-04-16T19:22:32","date_gmt":"2024-04-16T16:22:32","guid":{"rendered":"https:\/\/domo.experts2web.gr\/?post_type=erga&#038;p=1484"},"modified":"2024-04-26T17:28:05","modified_gmt":"2024-04-26T14:28:05","slug":"techniko-ano-diavasis-e-o-athinon-lamias-sti-thesi-diastafrosis-me-s-g-ch-th-4195772","status":"publish","type":"erga","link":"https:\/\/domo.experts2web.gr\/en\/erga\/techniko-ano-diavasis-e-o-athinon-lamias-sti-thesi-diastafrosis-me-s-g-ch-th-4195772\/","title":{"rendered":"ATHENS-LAMIA NATIONAL ROAD OVERPASS (CROSSING WITH RAILWAY)"},"content":{"rendered":"<p><b>Project Information:<\/b><\/p>\n<p>The bridge is located at the National Road Athens\u2013Lamia and passes over the New High Speed Railway Line, Motorway \u039565-D, and \nRoad 1N.<\/p>\n<p>The bridge consists of two independent branches with total length 837,21m (22 spans in each branch) and is divided in 6 sections with seismic joints.<\/p>\n<p>The superstructure\u2019s cross section is composite, and consists of a reinforced slab on a grid of 4 main steel T-beams (1,60m in height).The total height of the superstructure cross section is 1.95m. <strong>\u03c3\u03cd\u03bc\u03bc\u03b9\u03ba\u03c4\u03b7 \u03b1\u03c0\u03bf\u03c4\u03b5\u03bb\u03bf\u03cd\u03bc\u03b5\u03bd\u03b7 \u03b1\u03c0\u03cc \u03c4\u03ad\u03c3\u03c3\u03b5\u03c1\u03b9\u03c2 \u03bc\u03b5\u03c4\u03b1\u03bb\u03bb\u03b9\u03ba\u03ad\u03c2 \u03ba\u03cd\u03c1\u03b9\u03b5\u03c2 \u03b4\u03bf\u03ba\u03bf\u03cd\u03c2 \u03cd\u03c8\u03bf\u03c5\u03c2 1.60\u03bc \u03ba\u03b1\u03b9 \u03c0\u03bb\u03ac\u03ba\u03b1 \u03ba\u03b1\u03c4\u03b1\u03c3\u03c4\u03c1\u03ce\u03bc\u03b1\u03c4\u03bf\u03c2 \u03bf\u03c0\u03bb\u03b9\u03c3\u03bc\u03ad\u03bd\u03bf\u03c5 \u03c3\u03ba\u03c5\u03c1\u03bf\u03b4\u03ad\u03bc\u03b1\u03c4\u03bf\u03c2<\/strong>. \u03a4\u03bf \u03c3\u03c5\u03bd\u03bf\u03bb\u03b9\u03ba\u03cc \u03cd\u03c8\u03bf\u03c2 \u03c4\u03bf\u03c5 \u03c6\u03bf\u03c1\u03ad\u03b1 \u03b1\u03bd\u03c9\u03b4\u03bf\u03bc\u03ae\u03c2 \u03b5\u03af\u03bd\u03b1\u03b9 1,95\u03bc.<\/p>\n<p>Client:<b> ERGA OSE<\/b><\/p>\n<p>Date:<b> 2004 - 2006\u00a0<\/b><\/p>\n<p>Location:<b> National Roads Athens - Lamia, Greece<\/b><\/p>\n<p>Estimated Cost of Construction: <strong>46.930.000 \u20ac<\/strong><\/p>\n<p><b>Scope of Work:<\/b><\/p>\n<p>Based on our contractual obligations our firm provided the following services:<\/p>\n<ul>\n<li>Examination of 2 design alternatives &amp; Schematic Structural Design.<\/li>\n<li>Final Structural Design (Detailed).<\/li>\n<\/ul>","protected":false},"author":2,"featured_media":1485,"parent":0,"template":"","erga_categories":[5],"class_list":["post-1484","erga","type-erga","status-publish","has-post-thumbnail","hentry","erga_categories-gefyres"],"_links":{"self":[{"href":"https:\/\/domo.experts2web.gr\/en\/wp-json\/wp\/v2\/erga\/1484","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/domo.experts2web.gr\/en\/wp-json\/wp\/v2\/erga"}],"about":[{"href":"https:\/\/domo.experts2web.gr\/en\/wp-json\/wp\/v2\/types\/erga"}],"author":[{"embeddable":true,"href":"https:\/\/domo.experts2web.gr\/en\/wp-json\/wp\/v2\/users\/2"}],"version-history":[{"count":6,"href":"https:\/\/domo.experts2web.gr\/en\/wp-json\/wp\/v2\/erga\/1484\/revisions"}],"predecessor-version":[{"id":1599,"href":"https:\/\/domo.experts2web.gr\/en\/wp-json\/wp\/v2\/erga\/1484\/revisions\/1599"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/domo.experts2web.gr\/en\/wp-json\/wp\/v2\/media\/1485"}],"wp:attachment":[{"href":"https:\/\/domo.experts2web.gr\/en\/wp-json\/wp\/v2\/media?parent=1484"}],"wp:term":[{"taxonomy":"erga_categories","embeddable":true,"href":"https:\/\/domo.experts2web.gr\/en\/wp-json\/wp\/v2\/erga_categories?post=1484"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}